-
Preliminary design for the bridge over
Vrbas River in Klašnice, Banja Luka
-
Main project design for the bridge over
Vrbas River in Klašnice, Banja Luka, bridge span 93 m
-
Main project design for the bridge over
Ponor Bridge on primary route M-5 Zableće -Mrkonjić Grad
– Jezero, bridge span 27 m
-
Main project design for the bridge over
Bosna River in Šamac, bridge span 250 m
-
Main project design for the bridge over
Sava channel – Ukrina in Donji Klakar, bridge span 21 m
-
Final Design for the reconstruction of
the bridge over Bistrica River in Tuhalji, road M-18
Sarajevo – Brod na Drini, Contract IA 113/2005
-
Final design with details for the
reconstruction of the bridge over Ugar River, on R-413,
km 44+980, Kneževo, bridge span 30 m
-
Final design for bridge reconstruction –
loop in Mrkonjić Grad
-
Final design for reconstruction of
railway bridge on KM 830+107 on railway Banja Luka –
Doboj, Contract 19191/04 (RS Railway Company)